| 1、Technilogical Principle       Coating Rehabiliatation is an inside Rehabiliatation applyingh extrusion coating device powered by compressed air,to perform the design coating thickness,and in turn complete the pipeline anti-corrosion and reiforced rehabilitation.   2、Process 
3、Features     (1)    (2)  According to experiment,the bond between steel pipes and  Polymer cement mortar  can sustain a pressure of 0.2 MPa;1.0 MPa and above between Epoxy grout and Polymer cement mortar,11.7 mpa new paiting material and Epoxy Grout.It can keep functioning for 5000hrs without any disshape under 80°C heat and 2mpa pressure.And also,it can sustain 2 hrs'pressure maintain from 0.4--1.6mpa without leaking.     (3)   High Bond Strength   
| Between Lays | Bong Strength |  
| Polymer cement mortar& Steelpline | 0.2mpa |  
| Epoxy Grout&Polymer cement mortar | >1.0mpa |  
| New Pait&Epoxy Grout | 11.7mpa |    (4)Good Corrosion Resistence   
| Medium | Tempreature | Pressure | Time | Phenomenon |  
| Oil+Sewage | 80°C | 2Mpa | 5000hr | None |    (5)Good Pressure Resistance   
| No. | Pressure(mpa) | Time | Worksite |  
| 1 | 0.4 | 2hr | NO Leakage |  
| 2 | 0.8 | 2hr | No Leakage |  
| 3 | 1.6 | 2hr | No Leakage |    (6)Repairing over 2km old pipelines at one time,it can consecutively pass bends&Links of 15D.Symple to operate,less euipement devotion,the operation cost is 60& less than buuilding a new pipeline.     4、Operation Pictures |