For home ★ Join collectio Chinese English
Home News About us Installation branch Pressure testing branch Lining repairing branch Crossing department International branch Inland branch Department Customer opinion
News
Corporate Culture
Engineering Information
Notice
Career Center
 
You now:Home > English > News > Engineering Information
                  Shanxi Pipeline Project of Installation Branch
 
Shanxi pipeline project of Installation Branch was completed on 12. 15. 2011. The main site of the project was in the Loess Plateau where there are undulating hills and ravines. Though the terrain is extremely complex and broken, the project was done successfully with the scientific program and hard working of our workers. Here are samples working seriously and responsible:
Li Yuqi, Wang Yixu, Jia Xianwei, Zhang Juchen, Wang Hongjun.

Previous: Equipments Checking of Pressure Test Branch
Next: Through the Assessment of Ministry of Housing

  
About us /  Customer service / Contact us Copyright © 2010 Henan ZhongTuo Petroleum Engineering Technology Co.,Ltd All rights reserved
豫ICP备05002509号