According to the Shenzhen pipeline project, we can see the understanding sense of Sino-foreign enterprises to HSE
July 2008, the Shenzhen company projects a formal pressure test pipeline construction, power plant construction site in Shenzhen Moon Bay. This project mainly to Φ323.9 Total length 670 meters of the pipeline through the ball, pressure and dry construction. The owner of the project joint venture in Shenzhen Dapeng DPLING. Although I am in engineering and technology services unit of work, but before the HSE management system, I know quite shallow. HSE literally only know that the health, safety, environmental quality system means, in its actual production application of the specific details of construction are not well understood. When we entered the project construction site, the owners details on the HSE requirements of very strict. All construction personnel must be held by appointment certificate, qualification certificate, all the equipment and materials have certification, materials list; construction is the construction workers must also wear protective glasses and masks; construction site must be equipped with fire extinguishers, warning signs, etc.;operating pits more than 1.5 meters, the need to use the ladder, and set hard in the surrounding envelope; construction jobs open every day of cold work, hot work industry orders, sales at 6:30 pm sharp single off after all construction work must be single stop; such as during the construction of a violation of the provisions of the Construction Department, the owners of the first photograph them as evidence, and then notify us of the construction project manager. As construction workers on the HSE management system in general does not matter how deep understanding and knowledge of the owners always thought the beginning was deliberately making things difficult for us, thinking often conflict with them. After a period of time and on-site supervision and the exchange of property owners, we found that the owners of our request is not deliberately making things difficult for us to imagine, but to ensure our safety and quality of construction, the construction provides a good environment to ensure our effective operation of the normal construction . We also truly appreciate the construction workers of the HSE management system gives us a useful place. Construction of the project down, in ensuring the quality of construction, we put an end to major construction accident, and even some small incidents such as falls are a little finger, or scrape a little skin is also rare, I am very grateful for HSE management Construction workers brought us the gospel. Details determine success or failure. Construction of this project allows us to have a re-HSE management awareness, safety put first, quality is the key. If we ignore the HSE management, not only the construction work could lead to a series of accidents, and accidents caused by direct and indirect losses, the amount of money can not be measured. This will not only dampen the enthusiasm of staff, reduce efficiency, but also seriously affect the reputation and image. But if we correct knowledge and understanding of HSE management system, active system, according to HSE specifications required by our construction methods to improve the construction quality, but also take the initiative to prevent the construction accident, serve two purposes, why not?
|